(10-26)

Green Light-Go Project
Pre-Application Scoping Form

A - Project Overview
Limited to timing/phasing modifications which are accomplished with existing equipment
Replacement, upgrade, or addition of traffic signal equipment which does not impact information shown on the traffic signal permit condition diagram
Modifications to items shown on the traffic signal permit condition diagram, but does not include replacement or installation of traffic signal supports
Modifications to the traffic signal which include replacement or addition of traffic signal poles, but retain some existing traffic signal equipment
Full modernization/replacement of all traffic signal equipment at an existing signalized intersection
B - Project Location
+ Add Signal
C - Cost Estimate
Construction Phase Detailed Estimate
+ Add Standard Construction Item + Add Custom Construction Item
Cost Estimate Summary
Traffic Signal Items
950 General Traffic Signal Items
951 Traffic Signal Supports
952 Controller Assembly
953 Traffic Signal Systems and Communications
954 Electrical Distribution
955 Signal Heads
956 Detectors
957 Advanced Traffic Signal Technology
Signing and Pavement Marking
93x Signs
96x Pavement Markings
Other Items
  Roadway Items
  Subtotal
% Mobilization (Lump Sum)
% Maintenance and Protection of Traffic (Lump Sum)
  Subtotal
% Cost Escalation
  Total Construction Phase
Other Phases
% Engineering/Design/Inspection
  Utilities
  Right-of-Way
Total Project Cost
  Total Project Cost
  Minimum Matching Funds Required (20%)
Grant Funding Request
Total
To submit this form, click "Save" and then attach the file to an email and send to GLG@pa.gov.
D - PennDOT Review