Traffic Signal Phasing Examples

The links below provide examples of the Movement and Sequence chart to be shown on Traffic Signal Plans in accordance with Chapter 33 of Publication 149 for various phasing scenarios. These examples are based on the May 2026 edition of Publication 149. The Movement and Sequence chart and Timing tables shown in these examples should be incorporated into new traffic signal designs as soon as possible without impacting project schedules, and must be used for projects let after October 1, 2026.

Where existing traffic signals plans are modified, such as Level 0, 1, or 2 projects (see Chapter 6 of Pub. 149), an older Movement, Sequence, and Timing chart may be retained.

Example # Title Left Turn Phases Right Turn Phases
1 Two Phase Operation - No Protected Turns Permissive Permissive
2a FYA with right turn overlap (T-intersection) Protected/permissive - 4-section FYA Protected/permissive - 5 section
2b Eight phase with Advance Warning Flasher Protected/permissive - 4-section FYA Permissive
2c Eight phase with right turn overlap Protected/prohibited - 3 section Protected/permissive - 5 section
3a Split phase Side street split phase - 4 section Permissive
3b Split phase with overlaps Mainline: Protected/prohibited - 3 section
Side Street: Split phase - 4 section
Protected/permissive - 5 section
4a Double intersection on one controller, no lagging green Mainline: Permissive
Side Street: Split phase - 4 section
Permissive
4b Double intersection on one controller, diamond interchange Protected/permissive - FYA Channelized-yield
4c Double intersection on one controller, with lagging green Protected/permissive Protected/permissive (RR preempt only)
5a Double intersection on one controller, seven phase operation Protected/permissive - 5 section Permissive
Training